1. Overview

Infrascan Innovations performs Ultrasonic Thickness Testing (UTT) of oil & gas infrastructure as its primary service. All NDT operations are governed by documented written procedures authored and approved by a qualified NDT Level III, performed by Level II certified personnel, and compliant with applicable international codes.

2. Governing Documents โ€” NDT Procedures
Document No.TitleRevAuthorReviewerStandard
IP-NDT-UT01Infrascan UT Straight Beam Examination ProcedureRev 0Dr. Aziz U. RehmanDr. Fadl H. Abdel Latif (KAUST)ASME Sec V; API 570/510
IP-SNT-WPNDT Personnel Qualification & Certification Written PracticeRev 0Dr. Aziz U. RehmanOmar AlhawsawiANSI/ASNT CP-189
OPS-JEP-001Job Execution Procedure โ€” UAV-Assisted UTTRev 1.3Omar Alhawsawi / Abdulla Alradhiโ€”Client specs; API 570
IF-NDT-UT01Infrascan Ultrasonic Examination Report FormRev 0Dr. Aziz U. RehmanOmar Alhawsawiโ€”
3. NDT Method โ€” Ultrasonic Thickness Testing (UTT)
ParameterSpecification
NDT MethodUltrasonic Testing (UT) โ€” Straight Beam Pulse-Echo for thickness measurement
EquipmentInfrascan FalconScan UT Crawler (AIR6 Systems)
Delivery PlatformSony Airpeak S1 UAV for attachment to elevated/inaccessible surfaces
Applicable CodesASME Boiler & Pressure Vessel Code Section V; API 570 (Piping); API 510 (Pressure Vessels); API 653 (Storage Tanks)
Calibration ReferenceStep wedge (same material family where possible) before each job and every 4 hours per IP-NDT-UT01 Section 9
CouplantPer IP-NDT-UT01 โ€” water-based or oil-based per surface and client requirements
Data RecordingIF-NDT-UT01 Inspection Report; thickness grid as per client drawings
Report Sign-offPerforming Inspector (Level II) + Technical Review by Dr. Aziz (Level III) for non-routine findings
4. Qualified NDT Personnel
NameLevelCertificationExpiryAuthority
Dr. Aziz U. RehmanUT Level IIIASNT #126392โ€”ASNT
Omar M. AlhawsawiInfrascan Crawler UT Level II / UTG Level IIIP-SNT-WP01 Dec 2028Dr. Aziz U. Rehman
Ahmed M. AlotaibiInfrascan Crawler UT Level II / UTG Level IIIP-SNT-WP01 Dec 2028Dr. Aziz U. Rehman
Muhand A. FakehUTG Level IIIP-SNT-WP01 Dec 2028Dr. Aziz U. Rehman
Talal AljabrTBCโ€”TBCโ€”
Khalid AlmobarakTBCโ€”TBCโ€”
5. Key Controls
ControlRequirementReference
Personnel qualificationOnly Level II or higher certified personnel perform and interpret UT resultsIP-SNT-WP; ANSI/ASNT CP-189
Procedure useIP-NDT-UT01 shall be on site and followed for every inspection. No deviation without Level III approval.IP-NDT-UT01
Calibration before useStep wedge calibration before each job, every 4 hours, and after any suspect readingIP-NDT-UT01 Section 9
Report formatIF-NDT-UT01 form used for all inspection reports; no freehand reportingIF-NDT-UT01
Client acceptanceAcceptance criteria shall be specified per contract; default to applicable API/ASME codeOPS-JEP-001
Report releaseReports released by COO or Lead NDT Inspector. Complex findings reviewed by Dr. Aziz before release.Authority Matrix QMS-ORG-001
Revision History
RevDateDescriptionPrepared ByApproved By
1.0May 2026Initial releaseAbdulla AlradhiDr. Aziz U. Rehman / Abdulla Alradhi